pcf1125 发表于 2011-2-11 21:47:59

谁帮翻译这个英文???

1) Summary of B/I Test
Progress defect detection and reliability test of HDD according to program written in
maintenance/cylinder in temperature 40±5℃, humidity 50±10% stress condition.
2) Progress B/I Test
① A way of detection for HDD defect by reading/ writing the existing written information.
3) Flow sheet.
① Down load if small defect like mentioned above occurred.
(Be sure to check download before progress B/I program. Led off if there is no program down
loaded or maintenance/cylinder is unreadable.)
ⓐ As Main and B/I Firmware are separate from VG11/VG11+ series, progress test after changing
to B/I Firmware before test.( if B/I finished, change main firmware.)
② Check appearance & jumper pin status.
(B/I test is Led off if jumper pin connection is incorrect.)
③ Connect drive to power supply.(same as drive ready.)
④ If drive is progressing burn-in regularly,led blink after ready.
⑤ If drive is progressing burn-in irregularly,led off after ready.
(Led Off or ready state if the initial state isn't burn-in low or cont-in flow when we check
B/I program by loading burn-in program: written by how to B/I flow, SETC 0,SETH 0,
SETS 5,(M/C region)
⑥ Mark failure and Led frequency appear when lots of defects are occurred or error in drive
is occurred during burn-in test.)
⑦ Led is repeated one time if pass after done test.
(Be cautious because burn-in test time is different by every model)
⑧ Write end-in flow on maintenance/cylinder if pass after done test and write fail-in flow
in fail case.
⑨ Led blank after write the test result. Pass: repeat one time. Fail: the number of error code.

muzisixin885 发表于 2011-2-12 10:38:11

呵呵,专业的英语不懂,,,试试google的翻译

zgsjz001 发表于 2011-10-6 20:08:17

回复 1# pcf1125


    1)B/ I测试的总结
根据编写的程序进展的缺陷检测和可靠性试验的硬盘
维修/缸温度为40±5℃,湿度50±10%的应力状态。
2)进展B / I测试
①一个硬盘缺陷的检测方法通过读/写现有的书面资料。
3)流动负债表。
①向下负荷,如果发生小的缺陷,如上述。
(请务必检查进展B / I程序前下载。LED关闭,如果没有计划下来
加载或维护/缸是不可读的。)
ⓐ作为主要和B/固件,我是从VG11/VG11单独+系列,改变后的测试进展
B /第一固件之前测试(如果B/我讲完后,变化的主要固件。)
②检查外观跳线引脚状态。
(B / I测试LED熄灭如果跳线针连接是不正确的的。)
③连接驱动器电源(相同的驱动器准备就绪)
④如果驱动器进行燃烧,定期,LED闪烁后准备。
⑤如果驱动器是进步的不规则燃烧,LED后准备起飞。
(带领关闭或就绪状态,如果初始状态是不烧低或续流当我们检查
B /第一所加载的程序刻录在方案:如何/我的流量,国家经贸委0,塞思0写的,
套5,(M / C区)
⑥马克的失败,并导致频率出现很多缺陷发生时,或在驱动器错误
期间发生的烧机测试。)
⑦LED重复一次,如果通过后完成测试。
(一定要小心,因为烧的测试时间是由每一个模型的不同)
⑧写入最终维修/缸的流量,如果做测试合格后,并写失败流量
在失败的情况下。
⑨带领空白后写的测试结果。密码:重复一次。失败:错误代码。
谷歌翻译的,能看懂多少算多少吧。总比没有强点.

shaogang77 发表于 2011-10-17 14:00:27

应该是开BURN TEST的说明

nitu023 发表于 2011-11-4 20:20:41

回复pcf1125


    1)B/ I测试的总结
根据编写的程序进展的缺陷检测和可靠性试验的硬盘
维修/缸温 ...
zgsjz001 发表于 2011-10-6 20:08 http://bbs.intohard.com/images/common/back.gif

佩服,佩服。
页: [1]
查看完整版本: 谁帮翻译这个英文???